欧美大片天天免费看视频-欧美大片日韩精品四虎影视-欧美大片全黄在线观看-欧美大片免费在线观看-欧美大片免费观看-欧美大片大片播放网站

網(wǎng)站首頁技術(shù)中心 > CD-800 Dicing Machine               Instruction
產(chǎn)品目錄
CD-800 Dicing Machine               Instruction
更新時(shí)間:2013-07-29 點(diǎn)擊量:3841

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

主站蜘蛛池模板: 波多野结衣在线观看中文字幕 | 免费福利资源站在线视频 | 美女和男人一起差差 | 高清国产欧美一v精品 | 亚洲XXX午休国产熟女屁 | 97大香伊在人人线色 | 欧美特级午夜一区二区三区 | 亚洲无线一二三区2021 | 亚洲视频免费在线观看 | 操女人bb| 特黄aa级毛片免费视频播放 | 免费毛片在线观看 | 欧美成人乱弄视频 | 色多多在线观看视频 | 四虎影视库永久在线地址 | 日本一本草久p | 99年水嫩漂亮粉嫩在线播放 | 色老板免费在线观看 | 精品国产一级在线观看 | 国产视频久久久 | 操黄| 午夜一级免费视频 | 免费观看在线 | 蘑菇香蕉茄子绿巨人丝瓜草莓 | 国产永久免费视频m3u8 | 美女被躁爽死 | 九九热在线免费观看 | 香蕉97超级碰碰碰免费公 | 满溢游泳池免费土豪全集下拉版 | 国产精品视频一区二区三区 | 国产亚洲欧美在线中文bt天堂网 | 大学生特黄特色大片免费播放 | chinese456老人gay china外卖员gay国产xnxx | 亚洲欧美日韩中文字幕久久 | 暖暖视频高清图片免费完整版 | 娇妻与公陈峰姚瑶小说在线阅读 | jiuse视频 | 女老板用丝袜脚夹我好爽 | 亚洲成综合人影院在院播放 | 无人视频在线观看完整版高清 | 极品主播的慰在线播放 |